The installation method of the vacuum tube furnace is as follows:ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Electrical Installation
Power configuration: 220V (380V). According to the user's electric control cabinet configuration power should be greater than 4Kw.ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
The thermocouple is inserted into the furnace with a depth of 25mm, and is connected with a temperature control instrument with an N-gradient compensation wire. Note: The quartz tube should be installed first and then the thermocouple. The thermocouple should not be in contact with the quartz tube. The electric furnace and the control cabinet are grounded as a whole, and the grounding resistance of the grounding wire should be less than 4Ω.ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Resistance wire connection mode: two wires in parallel, power supply: single-phase 220V (or 380V).ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Furnace installationch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
The electric stove can be placed on the workbench to suit the physiological operating height of the human body. The effective load of the workbench should be greater than 200KG.ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac ch5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Check and tightench5Muffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
Due to transportation and other reasons, check the fastening of each screw of the furnace body to confirm that it is correct.